{"id":25079,"date":"2026-11-26T09:36:48","date_gmt":"2026-11-26T09:36:48","guid":{"rendered":"https:\/\/engineerbabu.com\/blog\/?p=25079"},"modified":"2026-11-26T09:36:48","modified_gmt":"2026-11-26T09:36:48","slug":"cost-to-build-fitness-app-like-garmin-connect","status":"publish","type":"post","link":"https:\/\/engineerbabu.com\/blog\/cost-to-build-fitness-app-like-garmin-connect\/","title":{"rendered":"What is the Cost To Build Fitness App Like Garmin Connect in 2027"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Garmin Connect is not a step counter with a pretty dashboard. It is a sync layer, a time-series data engine, and a social platform stitched into one product. That is exactly why the cost to build fitness app like Garmin Connect rarely matches the quotes founders expect.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A basic tracker ships for under $50,000. A platform that ingests sensor data from multiple devices, scores recovery, and never drops a workout sits in a very different bracket.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This guide breaks the number down by feature, by stage, and by the decisions that quietly inflate it.<\/span><\/p>\n<h3><b>TL;DR<\/b><\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The cost to build fitness app like Garmin Connect ranges from roughly $55,000 for a lean MVP to $450,000 and above for a full sensor-driven platform.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Device sync, time-series data handling, and analytics scoring consume more budget than the user interface does.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">EngineerBabu builds these platforms with a CMMI Level 5 process, so the architecture holds once sync volume and user counts climb.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Post-launch running costs add another 18 to 25 percent of the build budget every year.<\/span><\/li>\n<\/ul>\n<h2><b>Why Garmin Connect Is Expensive to Replicate?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">This section explains where the engineering weight actually sits in a Garmin-style product. Each part below maps to a real line item in your quote. Understanding them first makes every cost estimate later in this guide easier to read.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Multi-Device Sync Is the Hardest Part<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Garmin Connect pulls data from watches, bike computers, scales, and chest straps. Each device sends a different payload at a different interval. Your backend has to accept all of it, deduplicate overlapping sessions, and reconcile offline workouts synced days later.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Reliable<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/wearable-device-integration-in-healthcare\/\"> <span style=\"font-weight: 400;\">wearable device integration<\/span><\/a><span style=\"font-weight: 400;\"> usually takes four to eight weeks on its own. Miss this and users see duplicated runs or missing sleep data, which is the fastest way to lose a fitness audience.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>The Data Layer Carries Real Weight<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">A single tracked run produces thousands of GPS, heart rate, and cadence points. Store that in a standard relational table and queries slow down badly within months. Garmin-class apps use time-series databases, batched writes, and pre-computed aggregates for weekly and monthly views.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Your<\/span><a href=\"https:\/\/engineerbabu.com\/services\/api-development\"> <span style=\"font-weight: 400;\">API development<\/span><\/a><span style=\"font-weight: 400;\"> work also has to handle Apple Health, Health Connect, and Strava exchanges. This layer typically absorbs 25 to 30 percent of the total engineering budget.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Analytics Are the Actual Product<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Nobody opens Garmin Connect to see raw numbers. They open it for training readiness, VO2 max estimates, and recovery scores. Those outputs come from tuned algorithms validated against real physiological data, not from simple averages.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Building and testing a credible scoring engine takes a data scientist alongside your app team. This is the single feature that separates a tracker from a platform people pay for.<\/span><\/p>\n<h2><b>Cost To Build Fitness App Like Garmin Connect: The Quick Answer<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The honest range for the cost to build fitness app like Garmin Connect is $55,000 to $450,000 or more. Where you land depends on how many device families you support and how deep your analytics go.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The table below reflects current market rates for experienced offshore teams, which is where most<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/fitness-app-development\/\"> <span style=\"font-weight: 400;\">fitness app development<\/span><\/a><span style=\"font-weight: 400;\"> budgets are spent today.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Build type<\/b><\/td>\n<td><b>What you get<\/b><\/td>\n<td><b>Timeline<\/b><\/td>\n<td><b>Cost range<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Lean MVP<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Manual logging, one wearable, basic charts<\/span><\/td>\n<td><span style=\"font-weight: 400;\">10 to 14 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$55,000 to $85,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Mid-tier app<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Two to three device integrations, social feed, goals<\/span><\/td>\n<td><span style=\"font-weight: 400;\">4 to 6 months<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$110,000 to $190,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Garmin-class platform<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Multi-device sync, training analytics, coaching, web portal<\/span><\/td>\n<td><span style=\"font-weight: 400;\">8 to 12 months<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$250,000 to $450,000+<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">These brackets sit noticeably above a general<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/mobile-app-development-cost\/\"> <span style=\"font-weight: 400;\">mobile app development cost<\/span><\/a><span style=\"font-weight: 400;\"> estimate for the same timeline. Sensor data and hardware integration are the reasons.<\/span><\/p>\n<h2><b>Feature-Wise Cost Breakdown<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Costs make far more sense per feature than per app. This section attaches a realistic range to each major module you would build. Use it to decide what belongs in version one and what can wait.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Feature module<\/b><\/td>\n<td><b>Engineering effort<\/b><\/td>\n<td><b>Cost estimate<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Onboarding, profiles, goal setup<\/span><\/td>\n<td><span style=\"font-weight: 400;\">2 to 3 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$6,000 to $11,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Activity tracking with live GPS<\/span><\/td>\n<td><span style=\"font-weight: 400;\">4 to 6 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$18,000 to $32,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Wearable sync for one device family<\/span><\/td>\n<td><span style=\"font-weight: 400;\">3 to 5 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$14,000 to $26,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Sleep and recovery scoring<\/span><\/td>\n<td><span style=\"font-weight: 400;\">5 to 7 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$25,000 to $45,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Training plans and coaching logic<\/span><\/td>\n<td><span style=\"font-weight: 400;\">6 to 8 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$30,000 to $55,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Social feed, challenges, leaderboards<\/span><\/td>\n<td><span style=\"font-weight: 400;\">4 to 5 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$16,000 to $28,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Companion web dashboard<\/span><\/td>\n<td><span style=\"font-weight: 400;\">5 to 6 weeks<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$20,000 to $38,000<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">Interface work deserves its own note here. A fitness app lives or dies on chart readability during a workout, so serious<\/span><a href=\"https:\/\/engineerbabu.com\/services\/ui-ux-design\"> <span style=\"font-weight: 400;\">UI\/UX design<\/span><\/a><span style=\"font-weight: 400;\"> usually claims 15 to 18 percent of the build. Infrastructure is the other quiet line item, since the role of<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/role-of-cloud-computing-in-app-scalability\/\"> <span style=\"font-weight: 400;\">cloud computing in app scalability<\/span><\/a><span style=\"font-weight: 400;\"> decides whether sync holds up at 100,000 users.<\/span><\/p>\n<h2><b>What Pushes the Cost To Build Fitness App Like Garmin Connect Higher?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Four decisions move your quote more than anything else on the feature list. Each one is made early, usually in the first two weeks. Getting them right is cheaper than correcting them in month six.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Number of Device Families<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Supporting Garmin, Polar, Apple Watch, Whoop, and Fitbit means five separate SDKs, five test matrices, and five sets of firmware quirks. Every additional family adds roughly $12,000 to $22,000 and two to four weeks of QA. Most successful apps launch with one or two and expand after retention data proves demand.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Native Versus Cross-Platform<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Continuous background GPS and Bluetooth sensor streaming behave differently on iOS and Android. Choosing between<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/native-vs-cross-platform-development\/\"> <span style=\"font-weight: 400;\">native vs cross platform development<\/span><\/a><span style=\"font-weight: 400;\"> changes your cost by 25 to 35 percent. Cross-platform works well for the dashboard and social layers. Deep sensor access still benefits from native modules, so most Garmin-style apps end up hybrid by design.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Health Data Compliance<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The moment you store heart rate, sleep, or menstrual data, privacy regulation enters your scope. HIPAA, GDPR, and consent management add encryption, audit logging, and data residency work. Budget $15,000 to $35,000 for this layer, and never treat it as a launch-week add-on.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Where Your Team Sits<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Rates swing more than feature counts do. A US agency bills $120 to $200 per hour, while senior teams in India bill $25 to $50. This is why<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/outsourcing-software-development-to-india\/\"> <span style=\"font-weight: 400;\">outsourcing software development to India<\/span><\/a><span style=\"font-weight: 400;\"> still cuts the same scope by 50 to 60 percent without thinning the engineering bench.<\/span><\/p>\n<h2><b>How the Budget Splits Across Stages?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Discovery and architecture take 8 to 10 percent of the total. For a sensor-heavy product, skipping it is the most expensive shortcut available, because data model mistakes surface only after months of synced history exist. Design claims 15 to 18 percent, covering wireframes, chart systems, and watch-face companion screens.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Core development absorbs 45 to 55 percent, split between mobile clients, backend services, and the analytics engine. If you are layering<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/ai-in-mobile-app-development\/\"> <span style=\"font-weight: 400;\">AI in mobile app development<\/span><\/a><span style=\"font-weight: 400;\"> for adaptive training plans, add 20 to 30 percent on top of that stage. QA and launch take the remaining 12 to 15 percent, and it runs longer here than in most apps.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">You are testing across devices, firmware versions, poor connectivity, and multi-hour sessions. Security review belongs in this window too, where<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/healthcare-data-security-best-practices\/\"> <span style=\"font-weight: 400;\">healthcare data security best practices<\/span><\/a><span style=\"font-weight: 400;\"> get validated before real user data arrives.<\/span><\/p>\n<h2><b>How to Reduce the Cost To Build Fitness App Like Garmin Connect?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">There are four reliable ways to cut this budget without producing a weak product. None of them involve hiring cheaper engineers. Each step below is something teams apply before writing a single line of code.<\/span><\/p>\n<h3><b>Step 1: Launch With One Device Family<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Pick the wearable your target users already own and integrate only that one. A runner-focused app may only need Garmin. A general wellness app may only need Apple Watch. This single decision removes $30,000 to $70,000 from your first release and shortens QA by weeks.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Treat the launch as<\/span><a href=\"https:\/\/engineerbabu.com\/services\/mvp-development\"> <span style=\"font-weight: 400;\">MVP development<\/span><\/a><span style=\"font-weight: 400;\"> and let real retention data decide which family you add second. Teams that integrate four devices upfront usually find that two of them carry almost no active users.<\/span><\/p>\n<h3><b>Step 2: Use Proven Algorithms Before Building Your Own<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Custom recovery and readiness scoring is the most expensive module on the list. Licensed physiological algorithms and open scientific models get you a credible version one for a fraction of the cost. Validate that users actually act on the score before investing in proprietary research.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Many apps discover that a simple, well-explained readiness number drives the same engagement as a complex one. You can always upgrade the engine once subscription revenue justifies a data science hire.<\/span><\/p>\n<h3><b>Step 3: Share Code Where Physiology Does Not Live<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Your dashboard, feed, profile, and settings screens behave identically on both platforms. Building them once with<\/span><a href=\"https:\/\/engineerbabu.com\/technologies\/flutter-development-services\"> <span style=\"font-weight: 400;\">Flutter development services<\/span><\/a><span style=\"font-weight: 400;\"> saves roughly 30 percent of frontend hours.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Keep native modules only for background location, Bluetooth streaming, and health framework access. This hybrid split is how most well-funded fitness apps actually ship today. It protects sensor reliability while keeping the rest of the product fast to build and cheap to iterate.<\/span><\/p>\n<h3><b>Step 4: Instrument Before You Expand<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Ship with analytics on every screen and every sync event from day one. Within eight weeks you will know which features people open and which ones they ignore. That data turns your roadmap into a set of funded decisions instead of guesses.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Most teams find that two or three planned features can be cut entirely. Doing this early is the difference between a focused version two and an expensive one nobody asked for.<\/span><\/p>\n<h2><b>What You Pay After Launch?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The build budget is not the full number. Plan for 18 to 25 percent of your development cost every year in ongoing<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/mobile-app-maintenance-and-support\/\"> <span style=\"font-weight: 400;\">mobile app maintenance and support<\/span><\/a><span style=\"font-weight: 400;\">. Wearable firmware updates break integrations regularly, and iOS and Android health framework changes arrive annually.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Cloud costs scale with sync volume rather than user count. Expect $800 to $4,000 monthly once you pass 50,000 active users, since each one may push thousands of data points daily.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Third-party services add more, including map tiles, push infrastructure, and any licensed algorithms. App store commissions take 15 to 30 percent of subscription revenue. Founders who plan these numbers early can<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/reduce-mobile-app-development-costs\/\"> <span style=\"font-weight: 400;\">reduce mobile app development costs<\/span><\/a><span style=\"font-weight: 400;\"> across year one by sizing infrastructure to real usage instead of projected hockey sticks.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The market supports the investment. Fortune Business Insights values the global fitness app market at $13.94 billion in 2026 and projects $38.71 billion by 2034, a 13.62 percent CAGR.<\/span><\/p>\n<h2><b>Building It With EngineerBabu<\/b><\/h2>\n<p><a href=\"http:\/\/engineerbabu.com\"><span style=\"font-weight: 400;\">EngineerBabu<\/span><\/a><span style=\"font-weight: 400;\"> builds sensor-driven health and fitness platforms end to end, from device integration through analytics and cloud architecture. The team operates on a CMMI Level 5 delivery framework, which matters most on products where a data model decision made in week two determines whether sync holds at scale.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Engineering is architecture first, so your backend is designed for years of time-series history rather than the first thousand users.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Work spans custom iOS and Android development, backend and API engineering, AI and ML, cloud, and DevOps. You can engage a full build team or<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/hire-dedicated-development-team-india\/\"> <span style=\"font-weight: 400;\">hire dedicated development team India<\/span><\/a><span style=\"font-weight: 400;\"> to extend your own engineers.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As a<\/span><a href=\"https:\/\/engineerbabu.com\/services\/mobile-app-development\"> <span style=\"font-weight: 400;\">mobile app development company<\/span><\/a><span style=\"font-weight: 400;\"> working across healthtech and fintech, EngineerBabu gives you a stage-by-stage cost breakdown before a line of code is written.<\/span><\/p>\n<h2><b>Final Thoughts<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The cost to build fitness app like Garmin Connect is not a single number you can look up once. It moves with device coverage, analytics depth, and compliance scope, and those three choices are yours to control.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Founders who scope version one narrowly and expand on real usage data consistently spend less and ship better products. Start by naming the one wearable and the one insight your users genuinely want. Everything else in the budget follows from that.<\/span><\/p>\n<h2><b>FAQs<\/b><\/h2>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Can I build a Garmin Connect alternative without my own hardware?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Yes. Most fitness platforms integrate with existing wearables through their SDKs and APIs. Hardware only becomes necessary if you want proprietary sensor data competitors cannot access or replicate.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>How long does a Garmin-style fitness app take to build?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">A focused MVP takes 10 to 14 weeks. A full platform with multi-device sync, training analytics, and a web dashboard realistically takes 8 to 12 months with a dedicated team.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Does Garmin allow third-party apps to access its data?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Yes. Garmin offers Health and Activity APIs through its developer program. Access requires an application and approval, and usage terms differ for consumer apps versus enterprise wellness platforms.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Is a subscription model necessary for fitness apps?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Not necessary, but it is the dominant model. Subscriptions fund the ongoing cloud and maintenance costs that sensor-heavy apps carry, which one-time purchase pricing rarely covers long term.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>What team size do I need for this kind of app?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Expect six to nine people. That typically means two mobile engineers, two backend engineers, a data specialist, a designer, a QA engineer, and a project manager across the core build.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Which is harder to build, the app or the analytics engine?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The analytics engine. App screens follow known patterns, while recovery and readiness scoring needs physiological validation, tuning against real user data, and ongoing refinement after launch.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Garmin Connect is not a step counter with a pretty dashboard. It is a sync layer, a time-series data engine, and a social platform stitched into one product. That is exactly why the cost to build fitness app like Garmin Connect rarely matches the quotes founders expect. A basic tracker ships for under $50,000. A [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":25080,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1258],"tags":[],"class_list":["post-25079","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-app-development"],"_links":{"self":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts\/25079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/comments?post=25079"}],"version-history":[{"count":1,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts\/25079\/revisions"}],"predecessor-version":[{"id":25081,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts\/25079\/revisions\/25081"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/media\/25080"}],"wp:attachment":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/media?parent=25079"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/categories?post=25079"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/tags?post=25079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}