{"id":24274,"date":"2026-09-10T11:12:33","date_gmt":"2026-09-10T11:12:33","guid":{"rendered":"https:\/\/engineerbabu.com\/blog\/?p=24274"},"modified":"2026-09-10T11:12:33","modified_gmt":"2026-09-10T11:12:33","slug":"cost-to-build-an-app-in-mumbai","status":"publish","type":"post","link":"https:\/\/engineerbabu.com\/blog\/cost-to-build-an-app-in-mumbai\/","title":{"rendered":"How Much Does It Cost to Build an App in Mumbai?"},"content":{"rendered":"<h2><b>TL;DR<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The cost to build an app in Mumbai usually falls between \u20b96 lakh and \u20b945 lakh, or roughly $7,000 to $50,000, depending on complexity.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Mumbai agency rates sit at \u20b91,500 to \u20b93,000 per hour, noticeably above Pune, Indore, or Jaipur teams for identical scope.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Core development takes 45 to 55% of the budget. Discovery and QA are the two stages founders cut first and regret most.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Fintech, insurance, and real-time logistics apps carry a 20 to 40% premium here because of compliance and integration load.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">EngineerBabu builds these products on a CMMI Level 5 process with stage-wise budgets, so founders see the cost before the code.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The cost to build an app in Mumbai ranges from about \u20b96 lakh for a lean single-platform build to \u20b91 crore and above for a regulated fintech or marketplace platform.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Rates in the city run higher than the rest of India because Mumbai concentrates BFSI clients, senior engineering talent, and expensive commercial real estate in one place.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Demand explains the pressure on pricing. India recorded 25.5 billion app downloads in 2025, up from 24.6 billion the year before, and time spent in apps climbed to 1.23 trillion hours (<\/span><a href=\"https:\/\/techcrunch.com\/2026\/01\/21\/indias-app-downloads-rebounded-to-25-5-billion-in-2025-fueled-by-ai-assistants-and-microdrama-boom\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Sensor Tower data via TechCrunch<\/span><\/a><span style=\"font-weight: 400;\">). Mumbai founders are building for that audience, and vendor quotes reflect it.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This guide breaks the number down by complexity, by stage, and by the specific things that inflate budgets in this city.<\/span><\/p>\n<h2><b>Cost to Build an App in Mumbai by Complexity<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Complexity, not screen count, decides the bracket you land in. Here is what current Mumbai market pricing looks like.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>App type<\/b><\/td>\n<td><b>What it includes<\/b><\/td>\n<td><b>Cost (INR)<\/b><\/td>\n<td><b>Cost (USD)<\/b><\/td>\n<td><b>Timeline<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Basic app<\/span><\/td>\n<td><span style=\"font-weight: 400;\">6 to 10 screens, static content, no custom backend<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b96L to \u20b912L<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$7K to $14K<\/span><\/td>\n<td><span style=\"font-weight: 400;\">6 to 9 weeks<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Mid-complexity app<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Login, payments, push, admin panel, third-party APIs<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b915L to \u20b940L<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$17K to $45K<\/span><\/td>\n<td><span style=\"font-weight: 400;\">12 to 20 weeks<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Complex platform<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Real-time data, AI features, multi-role access, audit trails<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b945L to \u20b91.2Cr+<\/span><\/td>\n<td><span style=\"font-weight: 400;\">$50K to $135K+<\/span><\/td>\n<td><span style=\"font-weight: 400;\">24 to 40 weeks<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">Most funded Mumbai startups land in the middle row. A D2C commerce app, a doctor booking app, or a driver-partner app almost always sits there once payments and notifications are added.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-24279\" src=\"https:\/\/engineerbabu.com\/blog\/wp-content\/uploads\/2026\/09\/01_cost_by_complexity.png\" alt=\"Bar chart of cost by app type\" width=\"1779\" height=\"1180\" title=\"\"><\/p>\n<h2><b>What Drives the Cost to Build an App in Mumbai<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Four decisions account for most of the variance between quotes for the same idea.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Platform strategy<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Two native codebases cost 60 to 80% more than one Flutter or React Native build. Native iOS and Android<\/span><a href=\"https:\/\/engineerbabu.com\/services\/mobile-app-development\"> <span style=\"font-weight: 400;\">mobile app development<\/span><\/a><span style=\"font-weight: 400;\"> makes sense for camera-heavy, offline, or hardware-linked products. For a first commercial version aimed at Indian users, cross-platform usually delivers the same experience for less.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Backend and integrations<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Each integration adds development plus testing time. UPI and card gateways, Aadhaar or PAN verification, CRM sync, logistics tracking, and WhatsApp notifications all stack up. Solid<\/span><a href=\"https:\/\/engineerbabu.com\/services\/api-development\"> <span style=\"font-weight: 400;\">API development<\/span><\/a><span style=\"font-weight: 400;\"> work on the payment and KYC layer alone can consume 15 to 20% of the build.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Design depth<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">A template-driven UI costs a fraction of a custom design system with motion, illustration, and a design library. Mumbai consumer apps competing with Zepto or CRED get benchmarked against that polish, which pushes design spend up.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Team seniority<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">A \u20b91,500 per hour team and a \u20b93,000 per hour team can quote the same total. The difference shows up in architecture decisions that either survive your first traffic spike or force a rebuild.<\/span><\/p>\n<h2><b>Mumbai Rates vs Other Indian Cities<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Location changes the hourly rate more than it changes the code. These are typical blended rates for app development work.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Team type<\/b><\/td>\n<td><b>Hourly rate<\/b><\/td>\n<td><b>Notes<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Mumbai full-service agency<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b91,500 to \u20b93,000<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Highest overheads, strongest BFSI exposure<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Bengaluru agency<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b91,400 to \u20b93,200<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Deep product and AI talent pool<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Pune studio<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b91,000 to \u20b92,200<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Common overflow choice for Mumbai founders<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Tier-2 partner (Indore, Jaipur, Coimbatore)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b9800 to \u20b91,800<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Same output at 30 to 40% lower cost<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Independent freelancer<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b9600 to \u20b91,500<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Cheapest, weakest on QA and continuity<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">For perspective, US agencies bill $100 to $200 an hour, which is why so many<\/span><a href=\"https:\/\/engineerbabu.com\/blog\/mobile-app-development-companies-in-the-usa\/\"> <span style=\"font-weight: 400;\">mobile app development companies<\/span><\/a><span style=\"font-weight: 400;\"> in the States run delivery from India. Many Mumbai founders now do the same in reverse.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">They keep product ownership in BKC or Lower Parel and run engineering from a partner in a lower-cost city.<\/span><\/p>\n<h2><b>Where the Budget Actually Goes<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Ask any vendor to split the quote by stage. A single lump sum hides the tradeoffs you most need to see.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Stage<\/b><\/td>\n<td><b>Share of budget<\/b><\/td>\n<td><b>Typical duration<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Discovery and scoping<\/span><\/td>\n<td><span style=\"font-weight: 400;\">8 to 10%<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1 to 2 weeks<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">UI\/UX design<\/span><\/td>\n<td><span style=\"font-weight: 400;\">12 to 18%<\/span><\/td>\n<td><span style=\"font-weight: 400;\">2 to 4 weeks<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Core development<\/span><\/td>\n<td><span style=\"font-weight: 400;\">45 to 55%<\/span><\/td>\n<td><span style=\"font-weight: 400;\">8 to 16 weeks<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">QA and security testing<\/span><\/td>\n<td><span style=\"font-weight: 400;\">10 to 15%<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Runs parallel, plus 2 weeks<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Project management<\/span><\/td>\n<td><span style=\"font-weight: 400;\">8 to 10%<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Full project<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Launch and store submission<\/span><\/td>\n<td><span style=\"font-weight: 400;\">3 to 5%<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1 week<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">Discovery looks like the easiest line to delete. It is also the stage that prevents the mid-build scope fight that adds lakhs to the final invoice.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-24280\" src=\"https:\/\/engineerbabu.com\/blog\/wp-content\/uploads\/2026\/09\/03_budget_allocation_donut.png\" alt=\"Donut chart showing % of budget per project stage\" width=\"1690\" height=\"1687\" title=\"\"><\/p>\n<h2><b>Mumbai-Specific Cost Drivers<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Some cost pressures are local. They show up repeatedly in quotes from this city and rarely in quotes from smaller markets.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>BFSI compliance:<\/b><span style=\"font-weight: 400;\"> Mumbai is India&#8217;s financial capital, so many apps here touch lending, insurance, or payments. RBI-aligned data storage, audit logs, and encryption work add real hours to any<\/span><a href=\"https:\/\/engineerbabu.com\/industries\/fintech\/app-development-company\"> <span style=\"font-weight: 400;\">fintech app development<\/span><\/a><span style=\"font-weight: 400;\"> project.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Language coverage:<\/b><span style=\"font-weight: 400;\"> Supporting Marathi and Hindi alongside English means more than translation. It means layout testing, font rendering, and content pipelines.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Real-time features:<\/b><span style=\"font-weight: 400;\"> Quick commerce and mobility apps need live tracking and socket infrastructure, which raises both build and server cost.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Device spread:<\/b><span style=\"font-weight: 400;\"> Your users range from \u20b98,000 Android phones to the latest iPhone, so QA has to cover both ends.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Talent competition:<\/b><span style=\"font-weight: 400;\"> Senior engineers in Mumbai are bid on by banks and unicorns, and agency rate cards absorb that.<\/span><\/li>\n<\/ul>\n<h2><b>How AI Features Change the Cost to Build an App in Mumbai<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">AI has stopped being a differentiator and become a line item. Adding a support chatbot, a recommendation feed, or document extraction through<\/span><a href=\"https:\/\/engineerbabu.com\/services\/ai-development\"> <span style=\"font-weight: 400;\">AI development<\/span><\/a><span style=\"font-weight: 400;\"> typically raises the base build cost by 20 to 40%.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Two things drive that. First, prompt design, guardrails, and evaluation need engineering time that traditional features do not. Second, inference is a recurring bill, not a one-time cost. A moderately used assistant can run \u20b925,000 to \u20b91.5 lakh a month in model and infrastructure charges.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Custom models cost more again. If you need a credit risk score or a demand forecast trained on your own data,<\/span><a href=\"https:\/\/engineerbabu.com\/technologies\/machine-learning-development-services\"> <span style=\"font-weight: 400;\">ML development<\/span><\/a><span style=\"font-weight: 400;\"> work adds four to ten weeks and a data pipeline you have to maintain.<\/span><\/p>\n<h2><b>Four Ways to Cut the Cost Without Cutting the App<\/b><\/h2>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Ship an MVP, not version three<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Scope to the one workflow that proves people want this. A focused<\/span><a href=\"https:\/\/engineerbabu.com\/services\/mvp-development\"> <span style=\"font-weight: 400;\">MVP development<\/span><\/a><span style=\"font-weight: 400;\"> build usually costs 40 to 55% less than a full launch and reaches users months earlier. You then spend the remaining budget on features your data supports rather than features from a planning document. Founders who skip this step commonly pay twice, once to build assumptions and again to remove them.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Choose one platform first<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Check your own analytics before splitting the budget across iOS and Android. If 85% of your web traffic is Android, launch Android and follow with iOS after retention holds. This single decision often saves \u20b98 lakh to \u20b915 lakh on a mid-complexity build. Cross-platform frameworks give you a middle path, with one codebase serving both stores at close to single-platform cost.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Use proven services instead of building them<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Authentication, payments, notifications, chat, and analytics all have mature providers. Building any of them in-house adds weeks and creates code you must maintain forever. Integrating Razorpay, Firebase, or a KYC vendor costs a fraction of custom work and comes with compliance already handled. Reserve custom engineering for the logic that makes your product different from every competitor in your category.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Fix scope in writing<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Lock the feature list, acceptance criteria, and change process before development starts. Ambiguity is what turns a \u20b920 lakh quote into a \u20b932 lakh invoice. Ask for a written change-request rate, a milestone schedule, and named engineers on the project. Also confirm who owns the repository and the design files. Clear paperwork costs nothing and removes the most expensive category of surprise from any build.<\/span><\/p>\n<h2><b>Costs That Continue After Launch<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The build budget is not the whole number. Plan for these from month one.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Annual maintenance and updates: 15 to 20% of original development cost<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cloud hosting: \u20b915,000 to \u20b91.5 lakh a month, scaling with users<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Apple Developer Program: $99 a year, Google Play: $25 one-time<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Third-party API and SMS or WhatsApp costs, billed on usage<\/span><\/li>\n<\/ul>\n<h2><b>Final Thoughts<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The cost to build an app in Mumbai is a range, not a price, and the range narrows only after your feature list is specific. Two quotes that differ by \u20b915 lakh usually differ in what they assume about compliance, testing, and who writes the code.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Get every proposal split by stage, ask which engineers are assigned, and confirm what happens after launch. Founders who do that stay near their original budget. Founders who accept a single number rarely do.<\/span><\/p>\n<h2><b>FAQs<\/b><\/h2>\n<ul>\n<li aria-level=\"1\">\n<h3><b>What is the average cost to build an app in Mumbai?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Most projects land between \u20b915 lakh and \u20b940 lakh. Basic apps start near \u20b96 lakh, while regulated fintech or marketplace platforms cross \u20b91 crore.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Is it cheaper to build an app in Mumbai or in a tier-2 city?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Tier-2 partners typically cost 30 to 40% less per hour for comparable output. Many Mumbai founders keep product strategy local and place engineering elsewhere.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>How long does it take to build an app in Mumbai?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">A basic app takes 6 to 9 weeks. Mid-complexity apps run 12 to 20 weeks, and enterprise platforms need 24 weeks or more including testing.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Does an MVP really cost less than a full app?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Yes. A well-scoped MVP generally costs 40 to 55% less because it ships one core workflow instead of an entire roadmap.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>What should I budget for maintenance after launch?<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Plan 15 to 20% of your development cost each year, plus hosting and usage-based API charges. Ignoring this line is the most common budgeting mistake.<\/span><\/p>\n<p><br style=\"font-weight: 400;\" \/><br style=\"font-weight: 400;\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>TL;DR The cost to build an app in Mumbai usually falls between \u20b96 lakh and \u20b945 lakh, or roughly $7,000 to $50,000, depending on complexity. Mumbai agency rates sit at \u20b91,500 to \u20b93,000 per hour, noticeably above Pune, Indore, or Jaipur teams for identical scope. Core development takes 45 to 55% of the budget. Discovery [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":24281,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1258],"tags":[],"class_list":["post-24274","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-app-development"],"_links":{"self":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts\/24274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/comments?post=24274"}],"version-history":[{"count":1,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts\/24274\/revisions"}],"predecessor-version":[{"id":24282,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts\/24274\/revisions\/24282"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/media\/24281"}],"wp:attachment":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/media?parent=24274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/categories?post=24274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/tags?post=24274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}