{"id":21621,"date":"2025-12-30T09:00:07","date_gmt":"2025-12-30T09:00:07","guid":{"rendered":"https:\/\/engineerbabu.com\/blog\/?p=21621"},"modified":"2025-12-30T09:00:07","modified_gmt":"2025-12-30T09:00:07","slug":"how-long-does-it-take-to-build-custom-software","status":"publish","type":"post","link":"https:\/\/engineerbabu.com\/blog\/how-long-does-it-take-to-build-custom-software\/","title":{"rendered":"How Long Does It Take to Build Custom Software?"},"content":{"rendered":"<p data-start=\"115\" data-end=\"368\">Custom software usually takes <strong data-start=\"171\" data-end=\"196\">8\u201312 weeks for an MVP<\/strong>, <strong data-start=\"198\" data-end=\"233\">3\u20136 months for a growth product<\/strong>, and <strong data-start=\"239\" data-end=\"284\">6\u201312+ months for enterprise-grade systems<\/strong>. The exact timeline depends on scope, complexity, integrations, and decision speed.<\/p>\n<p data-start=\"370\" data-end=\"494\">This guide breaks timelines down <strong data-start=\"403\" data-end=\"421\">phase by phase<\/strong>, with real examples and ways to ship faster <strong data-start=\"466\" data-end=\"493\">without cutting quality<\/strong>.<\/p>\n<hr data-start=\"622\" data-end=\"625\" \/>\n<h2 data-start=\"627\" data-end=\"673\">What Determines a Custom Software Timeline?<\/h2>\n<p data-start=\"674\" data-end=\"726\">Five variables decide how long your build will take:<\/p>\n<ol data-start=\"728\" data-end=\"956\">\n<li data-start=\"728\" data-end=\"775\">\n<p data-start=\"731\" data-end=\"775\"><strong data-start=\"731\" data-end=\"751\">Scope &amp; features<\/strong> (MVP vs full product)<\/p>\n<\/li>\n<li data-start=\"776\" data-end=\"832\">\n<p data-start=\"779\" data-end=\"832\"><strong data-start=\"779\" data-end=\"793\">Complexity<\/strong> (AI, real-time, fintech, compliance)<\/p>\n<\/li>\n<li data-start=\"833\" data-end=\"878\">\n<p data-start=\"836\" data-end=\"878\"><strong data-start=\"836\" data-end=\"849\">Platforms<\/strong> (web only vs web + mobile)<\/p>\n<\/li>\n<li data-start=\"879\" data-end=\"909\">\n<p data-start=\"882\" data-end=\"909\"><strong data-start=\"882\" data-end=\"907\">Team size &amp; seniority<\/strong><\/p>\n<\/li>\n<li data-start=\"910\" data-end=\"956\">\n<p data-start=\"913\" data-end=\"956\"><strong data-start=\"913\" data-end=\"931\">Decision speed<\/strong> (client feedback cycles)<\/p>\n<\/li>\n<\/ol>\n<p data-start=\"958\" data-end=\"1023\"><strong data-start=\"958\" data-end=\"975\">takeaway:<\/strong> Clear scope + fast decisions = faster delivery.<\/p>\n<hr data-start=\"1025\" data-end=\"1028\" \/>\n<h2 data-start=\"1030\" data-end=\"1066\">Typical Timelines by Project Type<\/h2>\n<div class=\"TyagGW_tableContainer\">\n<div class=\"group TyagGW_tableWrapper flex w-fit flex-col-reverse\" tabindex=\"-1\">\n<table class=\"w-fit min-w-(--thread-content-width)\" data-start=\"1068\" data-end=\"1292\">\n<thead data-start=\"1068\" data-end=\"1095\">\n<tr data-start=\"1068\" data-end=\"1095\">\n<th data-start=\"1068\" data-end=\"1083\" data-col-size=\"sm\">Project Type<\/th>\n<th data-start=\"1083\" data-end=\"1095\" data-col-size=\"sm\">Timeline<\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"1106\" data-end=\"1292\">\n<tr data-start=\"1106\" data-end=\"1144\">\n<td data-start=\"1106\" data-end=\"1131\" data-col-size=\"sm\">Proof of Concept (PoC)<\/td>\n<td data-col-size=\"sm\" data-start=\"1131\" data-end=\"1144\">2\u20134 weeks<\/td>\n<\/tr>\n<tr data-start=\"1145\" data-end=\"1181\">\n<td data-start=\"1145\" data-end=\"1167\" data-col-size=\"sm\">MVP (core features)<\/td>\n<td data-col-size=\"sm\" data-start=\"1167\" data-end=\"1181\">8\u201312 weeks<\/td>\n<\/tr>\n<tr data-start=\"1182\" data-end=\"1219\">\n<td data-start=\"1182\" data-end=\"1205\" data-col-size=\"sm\">Growth-stage product<\/td>\n<td data-col-size=\"sm\" data-start=\"1205\" data-end=\"1219\">3\u20136 months<\/td>\n<\/tr>\n<tr data-start=\"1220\" data-end=\"1258\">\n<td data-start=\"1220\" data-end=\"1242\" data-col-size=\"sm\">Enterprise software<\/td>\n<td data-col-size=\"sm\" data-start=\"1242\" data-end=\"1258\">6\u201312+ months<\/td>\n<\/tr>\n<tr data-start=\"1259\" data-end=\"1292\">\n<td data-start=\"1259\" data-end=\"1278\" data-col-size=\"sm\">AI-heavy systems<\/td>\n<td data-col-size=\"sm\" data-start=\"1278\" data-end=\"1292\">4\u20139 months<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<hr data-start=\"1294\" data-end=\"1297\" \/>\n<h2 data-start=\"1299\" data-end=\"1335\">Phase-by-Phase Timeline Breakdown<\/h2>\n<h3 data-start=\"1337\" data-end=\"1376\">1) Discovery &amp; Planning (2\u20134 weeks)<\/h3>\n<p data-start=\"1377\" data-end=\"1393\"><strong data-start=\"1377\" data-end=\"1393\">What happens<\/strong><\/p>\n<ul data-start=\"1394\" data-end=\"1493\">\n<li data-start=\"1394\" data-end=\"1417\">\n<p data-start=\"1396\" data-end=\"1417\">Business goals &amp; KPIs<\/p>\n<\/li>\n<li data-start=\"1418\" data-end=\"1442\">\n<p data-start=\"1420\" data-end=\"1442\">Feature prioritization<\/p>\n<\/li>\n<li data-start=\"1443\" data-end=\"1466\">\n<p data-start=\"1445\" data-end=\"1466\">Architecture planning<\/p>\n<\/li>\n<li data-start=\"1467\" data-end=\"1493\">\n<p data-start=\"1469\" data-end=\"1493\">Risk &amp; compliance review<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1495\" data-end=\"1579\"><strong data-start=\"1495\" data-end=\"1514\">Why it matters:<\/strong><br data-start=\"1514\" data-end=\"1517\" \/>Skipping discovery saves 2 weeks and <strong data-start=\"1554\" data-end=\"1578\">loses 2 months later<\/strong>.<\/p>\n<hr data-start=\"1581\" data-end=\"1584\" \/>\n<h3 data-start=\"1586\" data-end=\"1617\">2) UX\/UI Design (2\u20133 weeks)<\/h3>\n<p data-start=\"1618\" data-end=\"1634\"><strong data-start=\"1618\" data-end=\"1634\">What happens<\/strong><\/p>\n<ul data-start=\"1635\" data-end=\"1694\">\n<li data-start=\"1635\" data-end=\"1647\">\n<p data-start=\"1637\" data-end=\"1647\">Wireframes<\/p>\n<\/li>\n<li data-start=\"1648\" data-end=\"1670\">\n<p data-start=\"1650\" data-end=\"1670\">Clickable prototypes<\/p>\n<\/li>\n<li data-start=\"1671\" data-end=\"1694\">\n<p data-start=\"1673\" data-end=\"1694\">User flows &amp; journeys<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1696\" data-end=\"1754\"><strong data-start=\"1696\" data-end=\"1707\">Output:<\/strong> Designs that reduce rework during development.<\/p>\n<hr data-start=\"1756\" data-end=\"1759\" \/>\n<h3 data-start=\"1761\" data-end=\"1793\">3) Development (8\u201324+ weeks)<\/h3>\n<p data-start=\"1794\" data-end=\"1810\"><strong data-start=\"1794\" data-end=\"1810\">What happens<\/strong><\/p>\n<ul data-start=\"1811\" data-end=\"1909\">\n<li data-start=\"1811\" data-end=\"1843\">\n<p data-start=\"1813\" data-end=\"1843\">Frontend &amp; backend development<\/p>\n<\/li>\n<li data-start=\"1844\" data-end=\"1865\">\n<p data-start=\"1846\" data-end=\"1865\">APIs &amp; integrations<\/p>\n<\/li>\n<li data-start=\"1866\" data-end=\"1909\">\n<p data-start=\"1868\" data-end=\"1909\">Feature iterations in sprints (1\u20132 weeks)<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1911\" data-end=\"1927\"><strong data-start=\"1911\" data-end=\"1927\">Typical pace<\/strong><\/p>\n<ul data-start=\"1928\" data-end=\"1981\">\n<li data-start=\"1928\" data-end=\"1948\">\n<p data-start=\"1930\" data-end=\"1948\">MVP: 4\u20136 sprints<\/p>\n<\/li>\n<li data-start=\"1949\" data-end=\"1981\">\n<p data-start=\"1951\" data-end=\"1981\">Growth product: 8\u201312 sprints<\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"1983\" data-end=\"1986\" \/>\n<h3 data-start=\"1988\" data-end=\"2032\">4) QA, Security &amp; Compliance (2\u20134 weeks)<\/h3>\n<p data-start=\"2033\" data-end=\"2049\"><strong data-start=\"2033\" data-end=\"2049\">What happens<\/strong><\/p>\n<ul data-start=\"2050\" data-end=\"2117\">\n<li data-start=\"2050\" data-end=\"2078\">\n<p data-start=\"2052\" data-end=\"2078\">Manual + automated testing<\/p>\n<\/li>\n<li data-start=\"2079\" data-end=\"2104\">\n<p data-start=\"2081\" data-end=\"2104\">Load &amp; security testing<\/p>\n<\/li>\n<li data-start=\"2105\" data-end=\"2117\">\n<p data-start=\"2107\" data-end=\"2117\">Bug fixing<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2119\" data-end=\"2177\">For fintech or enterprise products, this phase can extend.<\/p>\n<hr data-start=\"2179\" data-end=\"2182\" \/>\n<h3 data-start=\"2184\" data-end=\"2222\">5) Deployment &amp; Launch (1\u20132 weeks)<\/h3>\n<p data-start=\"2223\" data-end=\"2239\"><strong data-start=\"2223\" data-end=\"2239\">What happens<\/strong><\/p>\n<ul data-start=\"2240\" data-end=\"2305\">\n<li data-start=\"2240\" data-end=\"2261\">\n<p data-start=\"2242\" data-end=\"2261\">Cloud setup &amp; CI\/CD<\/p>\n<\/li>\n<li data-start=\"2262\" data-end=\"2284\">\n<p data-start=\"2264\" data-end=\"2284\">Monitoring &amp; backups<\/p>\n<\/li>\n<li data-start=\"2285\" data-end=\"2305\">\n<p data-start=\"2287\" data-end=\"2305\">Production release<\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"2307\" data-end=\"2310\" \/>\n<h2 data-start=\"2312\" data-end=\"2354\">Example Timelines (Realistic Scenarios)<\/h2>\n<h3 data-start=\"2356\" data-end=\"2389\">Example 1: Startup MVP (SaaS)<\/h3>\n<ul data-start=\"2390\" data-end=\"2482\">\n<li data-start=\"2390\" data-end=\"2427\">\n<p data-start=\"2392\" data-end=\"2427\">Features: auth, dashboard, payments<\/p>\n<\/li>\n<li data-start=\"2428\" data-end=\"2452\">\n<p data-start=\"2430\" data-end=\"2452\">Timeline: <strong data-start=\"2440\" data-end=\"2452\">10 weeks<\/strong><\/p>\n<\/li>\n<li data-start=\"2453\" data-end=\"2482\">\n<p data-start=\"2455\" data-end=\"2482\">Team: PM + 3 engineers + QA<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"2484\" data-end=\"2520\">Example 2: FinTech Loan Platform<\/h3>\n<ul data-start=\"2521\" data-end=\"2622\">\n<li data-start=\"2521\" data-end=\"2558\">\n<p data-start=\"2523\" data-end=\"2558\">Features: LOS + LMS, KYC, reporting<\/p>\n<\/li>\n<li data-start=\"2559\" data-end=\"2585\">\n<p data-start=\"2561\" data-end=\"2585\">Timeline: <strong data-start=\"2571\" data-end=\"2585\">4\u20136 months<\/strong><\/p>\n<\/li>\n<li data-start=\"2586\" data-end=\"2622\">\n<p data-start=\"2588\" data-end=\"2622\">Includes compliance &amp; integrations<\/p>\n<\/li>\n<\/ul>\n<h3 data-start=\"2624\" data-end=\"2663\">Example 3: Enterprise Internal Tool<\/h3>\n<ul data-start=\"2664\" data-end=\"2741\">\n<li data-start=\"2664\" data-end=\"2714\">\n<p data-start=\"2666\" data-end=\"2714\">Features: role-based access, analytics, ERP sync<\/p>\n<\/li>\n<li data-start=\"2715\" data-end=\"2741\">\n<p data-start=\"2717\" data-end=\"2741\">Timeline: <strong data-start=\"2727\" data-end=\"2741\">6\u20139 months<\/strong><\/p>\n<\/li>\n<\/ul>\n<hr data-start=\"2743\" data-end=\"2746\" \/>\n<h2 data-start=\"2748\" data-end=\"2778\">What Slows Projects Down \ud83d\udea7<\/h2>\n<ul data-start=\"2779\" data-end=\"2901\">\n<li data-start=\"2779\" data-end=\"2803\">\n<p data-start=\"2781\" data-end=\"2803\">Unclear requirements<\/p>\n<\/li>\n<li data-start=\"2804\" data-end=\"2830\">\n<p data-start=\"2806\" data-end=\"2830\">Frequent scope changes<\/p>\n<\/li>\n<li data-start=\"2831\" data-end=\"2851\">\n<p data-start=\"2833\" data-end=\"2851\">Delayed feedback<\/p>\n<\/li>\n<li data-start=\"2852\" data-end=\"2874\">\n<p data-start=\"2854\" data-end=\"2874\">Junior-heavy teams<\/p>\n<\/li>\n<li data-start=\"2875\" data-end=\"2901\">\n<p data-start=\"2877\" data-end=\"2901\">Late security planning<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2903\" data-end=\"2954\">Most delays are <strong data-start=\"2919\" data-end=\"2938\">process-related<\/strong>, not technical.<\/p>\n<hr data-start=\"2956\" data-end=\"2959\" \/>\n<h2 data-start=\"2961\" data-end=\"3009\">How to Build Faster (Without Breaking Things)<\/h2>\n<p data-start=\"3011\" data-end=\"3034\"><strong data-start=\"3011\" data-end=\"3034\">Proven accelerators<\/strong><\/p>\n<ul data-start=\"3035\" data-end=\"3169\">\n<li data-start=\"3035\" data-end=\"3054\">\n<p data-start=\"3037\" data-end=\"3054\">Start with an MVP<\/p>\n<\/li>\n<li data-start=\"3055\" data-end=\"3079\">\n<p data-start=\"3057\" data-end=\"3079\">Use proven tech stacks<\/p>\n<\/li>\n<li data-start=\"3080\" data-end=\"3105\">\n<p data-start=\"3082\" data-end=\"3105\">Senior-led architecture<\/p>\n<\/li>\n<li data-start=\"3106\" data-end=\"3137\">\n<p data-start=\"3108\" data-end=\"3137\">Parallel design + development<\/p>\n<\/li>\n<li data-start=\"3138\" data-end=\"3169\">\n<p data-start=\"3140\" data-end=\"3169\">Weekly demos &amp; fast approvals<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3171\" data-end=\"3218\">Speed comes from <strong data-start=\"3188\" data-end=\"3202\">experience<\/strong>, not shortcuts.<\/p>\n<hr data-start=\"3220\" data-end=\"3223\" \/>\n<h2 data-start=\"3225\" data-end=\"3256\">Agile vs Waterfall Timelines<\/h2>\n<div class=\"TyagGW_tableContainer\">\n<div class=\"group TyagGW_tableWrapper flex w-fit flex-col-reverse\" tabindex=\"-1\">\n<table class=\"w-fit min-w-(--thread-content-width)\" data-start=\"3258\" data-end=\"3414\">\n<thead data-start=\"3258\" data-end=\"3279\">\n<tr data-start=\"3258\" data-end=\"3279\">\n<th data-start=\"3258\" data-end=\"3266\" data-col-size=\"sm\">Agile<\/th>\n<th data-start=\"3266\" data-end=\"3279\" data-col-size=\"sm\">Waterfall<\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"3290\" data-end=\"3414\">\n<tr data-start=\"3290\" data-end=\"3334\">\n<td data-start=\"3290\" data-end=\"3313\" data-col-size=\"sm\">Incremental releases<\/td>\n<td data-col-size=\"sm\" data-start=\"3313\" data-end=\"3334\">Big-bang delivery<\/td>\n<\/tr>\n<tr data-start=\"3335\" data-end=\"3371\">\n<td data-start=\"3335\" data-end=\"3353\" data-col-size=\"sm\">Faster feedback<\/td>\n<td data-col-size=\"sm\" data-start=\"3353\" data-end=\"3371\">Late surprises<\/td>\n<\/tr>\n<tr data-start=\"3372\" data-end=\"3414\">\n<td data-start=\"3372\" data-end=\"3394\" data-col-size=\"sm\">Better for startups<\/td>\n<td data-col-size=\"sm\" data-start=\"3394\" data-end=\"3414\">Risky for change<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<p data-start=\"3416\" data-end=\"3461\"><strong data-start=\"3416\" data-end=\"3432\">\u00a0insight:<\/strong> Agile delivers value sooner.<\/p>\n<hr data-start=\"3463\" data-end=\"3466\" \/>\n<h2 data-start=\"3468\" data-end=\"3501\">Can You Launch While Building?<\/h2>\n<p data-start=\"3502\" data-end=\"3518\">Yes. Most teams:<\/p>\n<ul data-start=\"3519\" data-end=\"3583\">\n<li data-start=\"3519\" data-end=\"3537\">\n<p data-start=\"3521\" data-end=\"3537\">Launch MVP early<\/p>\n<\/li>\n<li data-start=\"3538\" data-end=\"3560\">\n<p data-start=\"3540\" data-end=\"3560\">Gather user feedback<\/p>\n<\/li>\n<li data-start=\"3561\" data-end=\"3583\">\n<p data-start=\"3563\" data-end=\"3583\">Improve continuously<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3585\" data-end=\"3620\">This reduces risk and improves ROI.<\/p>\n<hr data-start=\"3622\" data-end=\"3625\" \/>\n<h2 data-start=\"3627\" data-end=\"3665\">Who Delivers Predictable Timelines?<\/h2>\n<p data-start=\"3666\" data-end=\"3677\">Teams with:<\/p>\n<ul data-start=\"3678\" data-end=\"3772\">\n<li data-start=\"3678\" data-end=\"3702\">\n<p data-start=\"3680\" data-end=\"3702\">Strong discovery phase<\/p>\n<\/li>\n<li data-start=\"3703\" data-end=\"3721\">\n<p data-start=\"3705\" data-end=\"3721\">Senior engineers<\/p>\n<\/li>\n<li data-start=\"3722\" data-end=\"3744\">\n<p data-start=\"3724\" data-end=\"3744\">Clear sprint rituals<\/p>\n<\/li>\n<li data-start=\"3745\" data-end=\"3772\">\n<p data-start=\"3747\" data-end=\"3772\">Transparent communication<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3774\" data-end=\"3909\">That\u2019s why many companies choose partners like <span class=\"hover:entity-accent entity-underline inline cursor-pointer align-baseline\"><span class=\"whitespace-normal\">EngineerBabu<\/span><\/span>\u2014for <strong data-start=\"3863\" data-end=\"3908\">predictable delivery, not rushed promises<\/strong>.<\/p>\n<hr data-start=\"3971\" data-end=\"3974\" \/>\n<h2 data-start=\"3976\" data-end=\"3999\">FAQs<\/h2>\n<p data-start=\"4001\" data-end=\"4081\"><strong data-start=\"4001\" data-end=\"4048\">Q: Can custom software be built in 30 days?<\/strong><br data-start=\"4048\" data-end=\"4051\" \/>Only very small tools or PoCs.<\/p>\n<p data-start=\"4083\" data-end=\"4151\"><strong data-start=\"4083\" data-end=\"4114\">Q: Why do timelines extend?<\/strong><br data-start=\"4114\" data-end=\"4117\" \/>Scope creep and delayed decisions.<\/p>\n<p data-start=\"4153\" data-end=\"4229\"><strong data-start=\"4153\" data-end=\"4184\">Q: Is faster always better?<\/strong><br data-start=\"4184\" data-end=\"4187\" \/>No. Rushed builds increase long-term cost.<\/p>\n<p data-start=\"4231\" data-end=\"4309\"><strong data-start=\"4231\" data-end=\"4277\">Q: Should I wait for full build to launch?<\/strong><br data-start=\"4277\" data-end=\"4280\" \/>No. Launch early with an MVP.<\/p>\n<hr data-start=\"4311\" data-end=\"4314\" \/>\n<h2 data-start=\"4316\" data-end=\"4333\">Final Takeaway<\/h2>\n<p data-start=\"4334\" data-end=\"4492\">Custom software timelines are predictable when <strong data-start=\"4381\" data-end=\"4441\">scope is clear, teams are senior, and decisions are fast<\/strong>. Start small, launch early, and scale confidently.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Custom software usually takes 8\u201312 weeks for an MVP, 3\u20136 months for a growth product, and 6\u201312+ months for enterprise-grade systems. The exact timeline depends on scope, complexity, integrations, and decision speed. This guide breaks timelines down phase by phase, with real examples and ways to ship faster without cutting quality. What Determines a Custom [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1258],"tags":[],"class_list":["post-21621","post","type-post","status-publish","format-standard","hentry","category-app-development"],"_links":{"self":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts\/21621","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/comments?post=21621"}],"version-history":[{"count":1,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts\/21621\/revisions"}],"predecessor-version":[{"id":21622,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/posts\/21621\/revisions\/21622"}],"wp:attachment":[{"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/media?parent=21621"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/categories?post=21621"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/engineerbabu.com\/blog\/wp-json\/wp\/v2\/tags?post=21621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}